Miller Park

Replacement of all vertical and horizontal control joints in the concrete risers located at Club and Field Level Seating Bowls. This project required the removal of existing seat assemblies to access the work area.

Pabst Brewhouse

Chemical cleaning, masonry parapet rebuilding and tuck-pointing on this registered historic facility on the Pabst grounds.

Pabst Building 29

The historic restoration of Pabst Building 29 consisted of chemical cleaning, tuckpointing with stone and brick replacement and reconstruction. Over 250,000 reclaimed and reused brick were needed for the rebuilding of all parapets and chimneys.

Pabst Church

The restoration of the Pabst Church included chemical cleaning, tuckpointing and Cream City brick replacement. The foundation stone was repointed 100% with a “Bead” joint which was the original configuration in the 1800’s.

YWCA – Madison, Wisconsin

100% repointing of all brick and stione surfaces with Type O Mortar.

MATC-C Building

100% repointing of all mortar joints in Kasota Stone with hydraulic lime mortar.

Iron Horse Hotel

Complete restoration, including chemical cleaning, tuck-pointing, rebuilding of all parapet walls and related historic restoration.

Registered Historic Facility in Milwaukee’s Third Ward

Historic restoration, including parapet rebuild, chemical cleaning, tuck-pointing and rebuilding of arches above all windows.